Bin Harkil Metal Industries
Tanks
Home/Services/Tank Fabrication

Tank Fabrication

Steel and carbon-steel tanks built to hold up under real operating pressure and environmental exposure — not just pass an initial inspection.

Sized to the application. Not the other way around.

Bin Harkil fabrication facility at work
Fabrication hall — JeddahCarbon-steel silo
Built for

Three duties. One standard.

Water

Water storage

Potable and industrial water tanks, sized from site supply to plant-scale reserves.

Chemical

Chemical storage

Material and weld selection matched to the stored medium and its exposure conditions.

Industrial

Industrial uses

Silos, hoppers, and process tanks integrated with the client's production line.

How it's welded

By hand where skill matters. By robot where consistency does.

Welding is carried out primarily by hand by our experienced team, with robotic welding brought in for sections where consistency across long, continuous seams matters most — holding a fixed weld path and heat input that's hard to match by hand across long runs.

Weld planManual — structural & detail
Robotic — long continuous seams

Tell us what it holds. We'll build what holds it.

Capacity, the stored material, and where the tank will stand — an engineer will come back with a design direction and quote.

Direct line — Jeddah012 216 0666